Sorry I found no matches, Please try again. 176
vid = 4319pws_id = 324175pws_id = 324175
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.129.23.30 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

M1 Junction 18 Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with M1 Junction 18 Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

M1 Junction 18 Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, NN6 7FT    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 4 MW
Approx Date of 1st power generation: December 2014

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Also known as Daintree
Airvolution Energy Operational

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Land adj DIRFT Logistics Park Crick Rugby NN6 7FT England

 Associated Companies.

Relationship Company (For: M1 Junction 18 )
DeveloperAirvolution
DesignerAsh Design
ContractorRaymond Brown Renewables
ConsultantSavills

 DECC Data on this Project: M1 Junction 18 :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: M1 J18 Wind Turbines     4 MW
Energy Type: Wind Onshore
County: Northamptonshire     Country: England     LPA: Daventry District Council
Site ID and Reference: 4598 / AA562     District:
Applicant: Airvolution Energy     Application : DA/2011/0742 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 4
Site Address: Land Between Watling Street And M1, Celtic Way, Kilsby, Northamptonshire
 
County: Northamptonshire Region: East Midlands
OS Coordinates: 457472 / 457472
Development Status: Operational
Application Submitted: 9/9/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/7/2014    
Generator Live 12/15/2014 This Record Last Updated: 6/16/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: M1 Junction 18: Wind :

Site Name: Airvolution Energy (M1J18) Limited
Generator Type: Wind
Scheme : REGO Generator ID: G02628NWEN
Capacity: 3960 Status: Live
Accreditation Date: 9/9/2011    
Commission Date: 11/29/2014    
Applicant: Daintree Wind Farm Limited
Applicant Address: Daintree Wind Farm Limited 1030 Centre Park Slutchers Lane WARRINGTON wa11ql England
Address: Land adj DIRFT Logistics Park Crick Rugby NN6 7FT England
 
Assumptions: Capacity: 3960kW 3.96 MW,
Thus over the month Capacity * 720 hours per month = 2851.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
655 16.54% Issued
535 13.51% Issued
1089 27.50% Issued
969 24.47% Issued
01/01/2017 772 19.49% Issued
01/12/2016 - 31/12/2016 00 818 20.66% Issued
01/11/2016 - 30/11/2016 00 741 18.71% Issued
01/10/2016 - 31/10/2016 00 538 13.59% Issued
Oct-16 00 538 13.59% Issued
Sep-16 00 691 17.45% Issued
01/09/2016 - 30/09/2016 00 691 17.45% Issued
01/08/2016 - 31/08/2016 00 688 17.37% Issued
01/07/2016 - 31/07/2016 00 636 16.06% Issued
Jun-16 00 383 9.67% Issued
Jun-16 00 383 9.67% Issued
May-16 00 652 16.46% Issued
Apr-16 00 667 16.84% Issued
Mar-16 00 852 21.52% Redeemed
Feb-16 00 1192 30.10% Redeemed
Jan-16 00 1389 35.08% Redeemed
Dec-15 00 2 0.05% Pending Tr
Nov-15 00 1379 34.82% Redeemed
Oct-15 00 529 13.36% Redeemed
Sep-15 00 427 10.78% Redeemed
Aug-15 00 574 14.49% Redeemed
Jul-15 7330 733 18.51% Redeemed
Jun-15 6540 654 16.52% Redeemed
May-15 8630 862 21.77% Redeemed
Apr-15 6320 633 15.98% Redeemed
Mar-15 11790 1179 29.77% Redeemed
Feb-15 7930 793 20.03% Redeemed
Jan-15 14440 1444 36.46% Redeemed
Dec-14 13150 1316 33.23% Redeemed
845 21.34% Issued
776 19.60% Issued
1146 28.94% Issued
619 15.63% Issued
1005 25.38% Issued
1306 32.98% Issued
517 13.06% Issued
1172 29.60% Issued
914 23.08% Issued
529 13.36% Issued

 Calculations


Capacity: 8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/8/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 324175

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School